When Noble’s Hospital on the Isle of Man was looking to reduce operating costs ThermTech designed, manufactured and retrofitted three bespoke boiler economisers to help them do this. The hospital had two 6,000 kg/hr and one 4,000 kg/hr natural gas fired steam boilers running at 10 bar g each. The Solution Three bespoke boiler economisers […]
Case Study: Steam Boiler Economiser Retrofit Project
ThermTech were asked to design, manufacture and retrofit two bespoke steam boiler economisers to the boilers for a UK based specialty chemicals production facility to help further improve the energy efficiency of the site. The two natural gas fired boilers located at the site’s boiler house are each designed to provide a maximum of […]
Case Study: Retrofit Boiler Economiser for Textiles Manufacturer
This steam boiler project for a UK based textiles manufacturer involved the design, manufacture and retrofit of a bespoke boiler economiser in a horizontal orientation fitted directly onto the boiler flue exhaust flange with inlet / outlet gas side transitions to suit. The 8,000 kg/hr steam boiler runs at 8 bar g and […]
+44 (0)161 339 3049