When Noble’s Hospital on the Isle of Man was looking to reduce operating costs ThermTech designed, manufactured and retrofitted three bespoke boiler economisers to help them do this. The hospital had two 6,000 kg/hr and one 4,000 kg/hr natural gas fired steam boilers running at 10 bar g each. The Solution Three bespoke boiler economisers […]
Hospital energy saving project wins government award
When a hospital on the Isle of Man was looking to reduce operating costs, it worked with boiler manufacturer and contractor McQuillan to seek methods of reducing energy costs. With a payback period of just three years, the installation of three steam boiler economisers will provide an annual energy saving of over £30,000. Optimised design […]
+44 (0)161 339 3049