Brewery Economiser Replacement

The customer had an old economiser in place that was damaged due to the age of the unit and was currently in By-pass. Thermtech Engineers attended Site to measure the old unit and design a replacement that fit into the existing space and increased the amount of recovered heat than that of the existing. The work was done in a 5-day period and the boiler was put back to work reducing the overall downtime.

Project Details
  • Location: UK