ThermTech were asked to design, manufacture, and supply & install two replacement economisers for the hospitals waste heat steel boiler.

The economisers will together exchange 449 kw of heat ant thereby heat 4,600 KGH of DFW from 85°C to 168°C.

Based on performance of other similar economisers that we have installed over the years the savings will be of the order of £100,000 per annum.

In addition the reduction in CO2 emissions made by the economiser will be 835 tons per annum.

[table caption=”Case Study 5″ width=”500″ colwidth=”30|40|30″ colalign=”center|center|center”]
Capital Cost, £107K
Payback, 12 Months